News: Air Conditioning Feasibility Study

September 23, 2015

In April of 2015 the Board of Education approved an HVAC Feasibility Study for Rancho Vista Elementary School, Point Vicente Elementary School and Ridgecrest Intermediate School. The HVAC Feasibility Study that follows provides Rough Order of Magnitude (ROM) costs, which are estimates based on the assumption that no other conditions exist, as opposed to a detailed estimate you would perform on a completed design and construction model. The scope of the projects does not include items that may be triggered by a DSA review, which will also have an impact on the costs. There is a Single Project analysis as well as a project analysis separated by building or wing.

This study is now available for review at the following link:

2015 Air Conditioning Feasibility Study